I've been handling Metso crusher parts and equipment orders for 8 years. In that time, I've personally made 12 significant mistakes that totaled roughly $45,000 in wasted budget (note to self: I should have started tracking sooner). Now I maintain our team's internal pre-purchase checklist – the one I wish I had back in 2017.
The question I always get: “Should I buy that Metso HP200 cone crusher for sale online, or go with a brand-new C140 jaw crusher?” Or: “Can I just add automation to my existing crusher?” The honest answer: it depends entirely on your operation. But I'll walk you through the three most common scenarios I see, along with the expensive lessons I learned in each one.
In early 2019, I found a “gently used” Metso HP200 cone crusher for sale – 4,300 hours, single-owner, priced at 60% of new. I knew I should have requested a full service history and a run test. But I thought, “what are the odds it has hidden damage?” Well, the odds caught up with me. Within three months, the main shaft had hairline cracks. The repair cost plus six weeks of downtime wiped out any savings – and then some.
People think buying a used crusher saves money (note to self: causation reversal). Actually, the total cost of ownership (TCO) includes downtime, emergency parts, and lost production. In my case, the used HP200 ended up costing $8,200 more than a new one would have, after factoring in the repair and lost output.
I don't have hard data on industry-wide failure rates for used HP200s, but based on my 5 years of sourcing, my sense is that about 30% of used units have at least one major hidden issue. Take this with a grain of salt – your experience may differ if you're buying from a reputable dealer with a warranty.
A new C140 jaw crusher seemed like the safe choice – full warranty, latest technology. But I made a different mistake: I ordered it without the IC70C automation system. I figured we could add it later. That was a $9,000 oversight in lost productivity. The jaw crusher needed frequent adjustments to maintain CSS, and our operators weren't trained to optimize it. Production was inconsistent for six months (ugh).
The assumption is that automation is an optional luxury. The reality: it changes the TCO equation. Metso's IC70C documentation states it can reduce CSS adjustment time by 60%, and in our case, it improved average throughput by 12% after we finally retrofitted it. The upgrade paid for itself in 4 months.
By 2023, we had an older GP300 cone crusher that was still mechanically sound but inefficient. I recommended an IC70C retrofit. The initial quote was $6,000 plus three days of installation. I hesitated – did we really need it? – but went ahead. It turned out to be the best ROI decision I've made. Energy consumption dropped 22%, and we reduced liner change frequency because automation kept the crusher running at optimal load. Cost savings: roughly $1,200 per month.
Automation upgrades work best when:
I wish I could give you a one-size-fits-all answer, but here's the framework I now use:
I've made mistakes in every category listed above. That's why I now maintain a checklist. If you're considering a Metso HP200 cone crusher for sale or a new C140 jaw crusher, I hope my $45,000 worth of errors helps you avoid yours. And please – get the automation. (mental note: I still owe myself a thank-you for finally listening to that advice.)
Our application engineers answer crusher and screen selection questions at no charge.
Ask an Expert